Dubbo Sewer And Water Main Replacement

Dubbo Sewer And Water Main Replacement

Client: NSW Public Works for Dubbo Regional Council

Asset Owners: Dubbo Regional Council


Project description

The works involved the renewal of approximately 868 m of water main pipeline and 122 m of sewer pipelines ranging from DN100 PVC to DN150 DICL. The project required two separate water main renewals in the footpath on either side of Whylandra St replacing the existing single main from within the road way. One dedicated main was for businesses and the other for residents.

This project also included the lowering of a sewer gravity main crossing the highway just north of Minore Road. The project was funded by RMS and was completed ahead of major road reconstruction being programmed by the RMS.

Plant type

5t Excavators, Skip truck, small tipper Non Destructive Digging trucks, Combination Vacuum truck for pot holing.

Pipe size & length

Project was completed in 4 phases

  • 868m of water main DN150 DICL
  • 122m of sewer DN100 PVC
  • Open cut and Auger boring methods
Design and build dates

May 2018- July 2018

Project value

$997,000

Roles and responsibilities

Killard – Construct water pipeline & sewer

Stakeholder liaison

By Project Management Personnel

Safety and environment

Safety incidents – nil
Environmental incidents – nil

Client referees

Mr. Paul Yeo

Dubbo Regional Councilc

Relevance

This project demonstrates our ability to successfully deliver water main and sewer renewal projects in regional NSW

Benefit to Council is that the new mains will be outside the road way and the sewer main lowered thereby minimising impacts of future road re-construction on the water and sewer infrastructure

Whylandra St is the main thoroughfare through Dubbo and our ability to build infrastructure in a high density environment with multiple services showcases our experience and expertise