Quick contact info

icon_widget_image 2 Shirley St, Rosehill NSW 2142 icon_widget_image (02) 9638 7000 icon_widget_image contact@killard.com.au icon_widget_image Monday-Friday: 9am to 5pm; Weekends: CLOSED
Image Alt

About us

About

KILLARD INFRASTRUCTURE
PTY LTD

Commencing operations in 1999, Killard Infrastructure Pty Ltd (formerly – Killard Excavation Pty Ltd) is a multi- functional infrastructure company that has gained an outstanding reputation in the fields of water mains renewals retic and trunk mains, sewer system installation, storm water, water main, culvert remediation, culvert rehabilitation, CCTV investigation, NDD, civil, conduit relocation, bridge structures, retaining walls, electrical structures and gas pipelines. Killard provides a quality service to its clients with accredited quality, OHS, and environmental systems, implemented and maintained as one Integrated Management System. Killard delivers projects and works on time and within budget.

Killard is accredited to the List of Sydney Water Providers – Constructors and holds a Level 1 Service Provider Certification. Killard has installed a range of reticulation systems varying in size from 100mm PVC pipes to DN1050 DICL, DN1404 OD SCL (including SINTAKOTE) water main and recycled water pipes, 100mm PVC to 450 DICL sewer pipes, up to 1500mm diameter RC storm water pipes and varying sizes of box culverts. Although having numerous proficient pipe laying crews Killard can also provide a complete service, including construction of concrete structures and permanent concrete and bitumen surface restorations.

In January 2020, the Killard Group entity, acquired all the shares in Insituform Pacific Pty Ltd (IPPL). IPPL specialises in trenchless technology and now forms part of the Killard Group. IPPL are the pioneers in cured-in-place pipe (CIPP) technology, with an install base of over 40,000 km of CIPP worldwide. The last 50 years has seen the creation of products, standards and processes that have been instrumental in establishing the trenchless industry today.

RECENT LARGE-SCALE PROJECTS

Our company has strong capability and experience in delivering Water Main construction projects. We have recently been selected as a partner with the Jacobs-Broadspectrum-Downer JV for the Northern Region Delivery for the Sydney Water P4S program. Additionally, some of the projects undertaken by us are listed below for your reference.

  • Goulburn Mulwaree Council – Watermainrenewal
  • Cootamundra Gundagai Regional Council – Watermainrenewals
  • Dubbo Regional Council Watermainrenewal
  • Sydney Water NetworksAlliance
  • Sydney Water – Bulk WaterAlliance
  • Sydney Water – Spring Farm sewer construction
  • Sydney Water – Leppington sewerconstruction
  • Sydney Water – Prospect WatermainUpgrade
  • Sydney Water – Norwest Growth Centre Stage 2 and3A
  • Sydney Water – Northern roads upgrade Stage2
  • QGC – Polaris to Woleebee CreekWatermain

VALUE ADDED SERVICES

Services

Killard Infrastructure also offers the following trenchless and conventional pipeline renewal technologies which include:

HDD

CIPP relining

Micro-tunneling

Auger Boring

CCTV inspection

Swage lining

Pipe bursting

Quality Assurance

Having worked on numerous Sydney Water projects and closely with Sydney Water systems, Killard Infrastructure maintains efficient and transparent accreditation to AS/NZS ISO 9001:2015 and ISO 14001:2015 with an Integrated Management System in Safety, Quality and Environment as well as AS/NZS 4801:2001 for the scope of excavation, sewer, water, and drainage services. The Killard Infrastructure management and quality team ensures all projects we undertake adhere to our internal systems. We demand the highest quality work from ourselves while maintaining a relaxed and upbeat work environment.

Work Health and Safety

For projects, a specific safety management plan is developed on a contract by contract basis, based on Killard Infrastructure’s safety management template which meets the requirements of AS/NZS 4801:2001.

In accordance with AS/NZS 4801, the safety management plan addresses:

  • Identification of hazards specific to theproject
  • Assessment of risks associated with thosehazards
  • Safety measures and controls for the hazards andrisks
  • Nomination of responsible persons and assignment ofroles

Killard has developed a method to ensure proper compliance and consistent implementation of safety plans across all crews and locations through the development of its site folder packs.

Site specific folder packs include a series of checklists that crews must complete each day before commencing work.  This demonstrates that they have identified hazards and risks specific to their sites and tasks and confirms that they have implemented obligatory controls. Each crew member is required to sign on daily.